Electrification

 

electrificationSWGR provide the UK rail industry with Overhead Line Equipment (OLE), Construction and Isolation to OLEC (Overhead Line Equipment Construction) standards. Our expertise in rail electrification and our commitment to delivering projects on time and on budget, means we find the best solutions for our clients every time.

 

Isolation Planning and OLE Isolation Delivery

SWGR understands the importance of being able to tailor Isolations to the varied scope of work required, essential for successful delivery of projects for clients where maximising track time is paramount.

Our vast experience of Isolations together with our knowledgeable Isolation staff makes us best placed to ensure the correct Isolations are applied on a site-by-site and shift-by-shift basis.

 

OLE Construction Service

SWGR Overhead Line (OLEC certificated) staff undertake a range of activities from minor alterations (including emergency response) to carrying out a full OLE construction.

We can deliver the erection of OHL (Overhead Line) masts, small part steelwork and installation of catenaries and contact wire.

The service packages delivered by our OHL team includes renewal and maintenance of OHL equipment installation and construction of OHL foundations, OHL bonding and minor repairs, electrification planning and OHL Isolation delivery

  • All Isolation staff are trained on various skills i.e. ES, COSS, PC
  • All Isolations are walked out before they are planned
  • All Isolation staff have their own transport and equipment
  • SWGR staff are competent and professional in every aspect of work undertaken
  • After the Isolation is completed, staff can be utilised for other duties i.e., ES, COSS, etc., for the remainder of the contracted time as part of the original cost.

SWGR carry out regular safety visits with clients and offer a 24-hour emergency control facility. Contact: 0800 389 3799

All SWGR OLE staff are OLEC certificated.

OLE resource capability includes:

  • Construction Managers
  • Construction Supervisors
  • Linemen (LE1, LE2 and LE3)
  • Nominated Persons
  • Authorised Persons
  • SSOW Planners
  • PPS Planners

 

To find out how we can meet your rail electrifications needs, contact:

 

This e-mail address is being protected from spambots. You need JavaScript enabled to view it

Tel: 0844 692 0692

Fax: 0844 692 0693

 

Why SWGR?

What our clients say:

  • Local Knowledge

  • Dedicated 24hr response

  • Competitive costs

  • Can-do will-do attitude

Case studies

  • Airdrie Bathgate Line
  • Waverley Station Upgrade
  • Light Rail Link
  • Channel tunnel rail link
  • Southampton Rail Tunnel Upgrade

Airdrie Bathgate Line

Instigated as part of a round of transport improvement projects proposed by the then Scottish Executive in 2003, the plan was to open up a fourth direct railway link...

Read more...

Waverley Station Upgrade

Waverley Station in Edinburgh is the second biggest Railway Station in the UK, covering over 25 acres of space in the heart of the Scottish capital. Recent years have...

Read more...

SWGR Play A Role In Developing New Light Rail Link For The Capital

DLRL (Docklands Light Railway Limited) awarded a 30 year concession to design, build, finance and maintain the extension to Woolwich Arsenal to a joint venture company formed by AMEC plc...

Read more...

Channel Tunnel Rail Link

SWGR activities in the South of England contribute massively to the success of the Company. Supplying experienced teams to high-profile contracts in and around the major population centres of London...

Read more...

Southampton Rail Tunnel Upgrade

Building on its reputation as a company that is able to deliver manpower solutions in a range of settings, SWGR was asked to supply experienced railway personnel to a rail...

Read more...